K ELECTRIC Reviews & Complaints
By: AS
Contact information:
K ELECTRIC
KE helpless cum careless management
I want to open the close eyes of KE management & Power Minister why KE often conduct load shedding which is totally un-schedule to give torture to its consumers plus disturb their daily work schedule which become KE normal practice. More interesting to share KE have no purge to eliminate the load shedding but happy to conduct load shedding 2 to 3 times in a single day.
The load shedding which KE conduct due to management or staff wish only in end consumer suffer a lot, think about consumers such elderly people, women’s and kids those who have no alternative arrangement such UPS or Generator think what mental torture these type of consumers faced but honest speaking KE people not sincere with their consumers otherwise avoid such un schedule load shedding from Karachi.
I want to share KE feel proud to conduct load shedding totally un-schedule all 4 seasons
1. Autumn
2. Winter
3. Spring
4. Summer
KE conduct load shedding according to their wishes but no pre-schedule which is irking the consumers always that reason majority of consumers not satisfied with KE works.
During the month of beginning of April 2018 it is not too hot weather what happen to consumer when KE conduct load shedding during summer May, June & July ( which is consider hot month of summer). I have no idea how KE giving punishment to ill legal users by conduction load shedding 48 hours in a single day?
When our country power problem will be solved and citizen has confidence with KE which is only a sweet dream. It is very dis-appointment & sad Pakistan is ATOMI Muslim country but can’t overcome power crisis yet?
In last I must say strong trade bodies and association of Pakistan like FPCCI AND KCCI must condemn such load shedding and never realized how business community is being suffered with such load shedding.
Thanking You
Yours Faithfully
A S