Sewer Line Repair / Blocked Line till Ramzan

Sewer Line Repair Reviews & Complaints

By: Faisal Munir

Contact information:
Sewer Line Repair

Aoa
In Hasan Mujtaba Town the line is blocked till Ramadan-ul-Mubarak. in this period some time line was cleared by paid line men. but it is still blocked again and again and now the main holes are sealed from top but the saverage water is in homes and it is again a problem. an other big problem is “Malba” every road is full of different level of “Kachra/Malba” and no action from the Govt. Department against” Malba Mafia” because in my area water supply line’s depth is 8Ft or more. Roads are hidden by Malba, Gas line is in depth. So please clear all roads by removing the malba.

M. Faisal Munir
D-6 Hassan Mujtaba Town
Malir Halt Karachi -75210

Leave a Comment

Your email address will not be published. Required fields are marked *

© 2023 Pakistan Complaints Forum
Contact Us